The nodes are installed water level measuring device
is installed node points instrumentation drain aperture
The nodes are installed instrumentation door status (closed / open communication)
The nodes in the system are installed flow measurement device set
points in the system button set water quality measurement device
- Put measuring points Bao Dap because: Report Answers were installed surveillance systems, controllers 2013, SCADA connections only;
- Supplement 3 different measuring points is Bridge Store, Luc Dien and crossed to monitor water levels to serve the operator, by monitoring the actual requirements of water sources have been exhausted.
- Bao Dap has been installed;
- The project to rebuild the bridge culvert Vehicles scheduled for completion in 2017, which has designed, installed drain aperture measurement and automatic control.
- The point: Europe Xuan Quan, European Channel Bridge, Painting, Luc Dien, crossing, bridge Store only 2 modes of operation (open or closed communication) is thus not necessary measurement equipment.
In accordance with the actual operating.
- Bac Hung Hai Company operates system level mainly follow the key point.
- Based on needs determined amount of water taken into the system.
- Based on the recommendations of the Evaluation Report BHH SCADA system (Vietnamese version 02/5/2012 ) of consultants Inros Lackner AG: Cost of very high flow measurement; not suitable as natural river channel morphology changes over time.
- Due to other projects of the Institute for Hydraulic ongoing water quality monitoring. So just laying in sewer Bridge Vehicles, Saturn An observation often water quality for water service down.