Results (
English) 2:
[Copy]Copied!
Yoshida like,
I am always indebted. Was mistaken as a new event, but it was something that had been heard from before. Also, might it be content was insufficient explanation. Was your fuss. * Short pipe had please be attached to those who are parting the branches at the location of the T joint. This 14pcs is what you need to valve installation location on route straight portion. * ISO-JIS short pipe, I am aware that not arrived yet. It seems to be coming in that you are listening in carrying scheduled for early next year, but please check their breakdown (PL, INV). Every time it is barely. * 14 With regard to was ask minute, four you add Stubend was ISO. Rest on March 21 10pcs, please flange only. Stubend use the thing now. * In the bolts seem bolt length is not enough at the point where applied to Stubend, but I will contact you again after confirmation. Best regards. Ando Hazama Hosono Toshiya
Being translated, please wait..
