Results (
English) 3:
[Copy]Copied!
Environmental issues impact source potential
air quality dust from the preparation of construction area, activities of the drilling. Construction in the area, and the system has low
.The sound of the construction activities. Machinery, equipment and vehicles have low
transportation trucks from the material transportation device has low
.The water quality of rainwater leaching from the construction area may be contaminated oil, waste and rubbish ไม่มีผลกระทบ
land use and landscapes. The development of land no effect!Soil resources construction activities have to dig out the soil and soil erosion may have no effect
system ecological habitat disturbed by construction activities. No effect due to the lack of important plant in project area
.Society and economy increase employment for local people have positive
.
Being translated, please wait..
