Step 2: prepare the legal procedureTo be allowed to build, to ensure sufficient conditions:-The land must be recognized legally (GCNQSD Earth or soil GCNQSD and associated soil properties due to the QSH CQNN authorities) and is licensed to build.-The case of land, the project must be licensed BDA built based on detailed planning 1/500 of the whole project has been approved by the competent CQNN.-Must have designed the unit's XPXD has a legal practice certificate & design works-For land not belonging to the housing project, after a building permit must then set the building alarm points and ward reports in building plans.Step 3: select the design consultantSelect design consultants have full capacity, reputable.Consultant role:-Counseling jobs specialise in works match the actual conditions, requires the use of each Member, the family's financial capabilities.-Establishment of construction design, cost estimation and project progress.-See more at: http://trungnam.vn/tin-tuc/ngam-nhin-mau-nha-cap-4-dep-lung-linh-ve-dem#sthash.9nRIhgnR.dpuf
Being translated, please wait..