below are the test results for bezier.
we validate the testing, production is confirmed, the support teams (i / c) will be present tomorrow morning at 6:00 a.m. for the start of production. "in summary, the remaining defects (non blocking). are the following: (a)the flashing of the lamp appairage kb in some cases (red, but screen right) = > will be corrected in the next few days, in case of abnormality display false surplus with pvp (marginal defect.in some cases, abnormality at the close of the site (the site is not closed) = > implementation of log for additional analysis and site by two closure as long as the defect has not been resolved.
below the picture of the first suit of palletized mode volume, scan, with calculation of the filling by the sorter, more optimized.