Results (
English) 1:
[Copy]Copied!
Two large dam in the ongoing water crisis. Irrigation water management plan to use.Mr. Kueakun Manasamphansakun Head of water allocation and improve irrigation systems. Irrigation project in Chiang Mai The current dam that River Rock River complete chon A. hang Dong, Chiang Mai only 57 million cubic meters, or 21.6% Guangzhou rich Tara River Dam section a. 50220 Mai left only 31 million cubic meters of water, or 12%, so. Now, in the second major dam has only about 78 million cubic meters only. Water must be used to help the entire province, which made agriculture an area of more than four hundred acres. The current daily water helps to 55000 cubic meters, sufficient and continuous. However, if the crisis will impact the rain delay is that it must find a way to help find alternative sources of water to the next.All this. There is water in the dam, river rock out on average once a day, but with a cubic meter water 5.73 San inflow of just 3.6 billion cubic meters. Best water flow into the dam Mae Guang 3000 cubic meters 3.8 thousand cubic meters-flow design, the situation is also concerned. If there is no rain during the rest of this month will be 1-2 water use only this August, but this is still the book is another part of the water to be available until November. For water management in order to reduce the risk that will result in all of the water from the dam, sending water ever week 3 days must be reduced once a week for 2 days so that there is enough water in this phase.2 large water dam, on the continuing crisis in Chiang Mai.
Being translated, please wait..
