Results (
English) 1:
[Copy]Copied!
This is a study about the Changeover and Purge loss which is the problem Change Over time and the use of plastic in the machine to clean up too. To control the use of plastics, and increase the duration of working of the machine has done a study on the time it takes to clear the air, to prepare a new extrusion products. Which found that plastic is used to clear a lot and take the time to wait for a mechanic to change the long screw.
Being translated, please wait..
