Results (
English) 2:
[Copy]Copied!
In conjunction with a safety officer, the Environmental risk assessment was conducted before the operation. By evaluating the chances and severity of The scene for preventive measures and screening of work activity sequences with very high risk, high risk, medium risk, greater risk level.
Being translated, please wait..
