Results (
English) 2:
[Copy]Copied!
1. Those that are dropped from the blister will have been scattered as the attached photo.
→ those that do not even fall out of implementing the drop test by pushing neat is, it seems a fitting has occurred because of insufficient.
2. There are also those that deviate by falling crowded press controller and Rch housing is again among those dropped.
→ please check of all cavities. Please carried out at normal / i / iS.
3. Despite I model, there are things you are using a blister of iS. (Photo attached)
→ please go firmly on the management and QC check of the packaging material.
4. There are things that have lifted the mount in J100BK.
→ I have caught in the groove part of the mount. Please confirm in the work attention and QC.
5. With respect to WH code, there is a thing that is in some places pink. (Photo attached)
→ but it seems also the color of the coating of the sheath inside of Rch line, is dirty not uniform.
6. Only still J100BK but, 2pcs is I have easy housing is disengaged in 15pcs. (Normal 9 #, # 14)
→ welding is incomplete. For I / iS, but do the welding confirmation after the measurement, please re-adjustment of a separate welding machine.
7. Scratch has occurred to Deco (internal paint parts).
→ it is clearly NG level. (IS # 14) with respect to the property inspection, but will contact you separately your our measurement environment is measured as soon as free, even just appearance surface, this will end up with the LOT-OUT. Since there is still some time to MP, Please execute the adjustment and education.
Being translated, please wait..