Because AGA removes 2SV drawing Floor (Colling JIG) to give way first check SRN.Today at 11 a.m. and 13.30 time 2015 phok attached Drawing files in email this issue with it.Thanks dude
The AGA will be drawing 2SV Floor (Colling JIG) to the SRN checks before today, on 11 May 2015 at 13.30 hrs., and was attached to the mail this Drawing with thanks.