Results (
English) 1:
[Copy]Copied!
Subproject monitoring system data collection and control (SCADA) there are two main categories: (i) build system operator Northern Hai Hung and (ii) the provision and installation of SCADA devices.The category system operator Northern Hai Hung with scale of 4 floors, an area of 556 m2 construction ground, 1896 m2 floor area. Contract tenders in this category was given in late September 2015, currently in progress.Items supplied and installed the SCADA devices according to the original scale as follows:TT Single itemsthe position change reason parameter According to FS suggest tuning The SCADA system I 1 The node was installed water level measuring devices 1. Spring;2. Alarm Response3. Channel Bridge;4.;5. Neo;6. Count Cards;7. The bridge;8. An value. 1. Spring;2. Channel Bridge;3.;4. Anchor;5. Count Cards;6. Car Bridge7. An Aboriginal;8. Fill Power;9. the Europe bridge and take off;10. Using Rarefaction. -Remove the measuring point for Jaguar: Jaguar has installed surveillance system, controls by 2013, only connecting SCADA;-Additional 3 other measuring points is taking off, filling and Using Horizontal water level monitoring to serve the Administration, so the actual monitoring requirements on a water source dried up.2 The node was installed instruments open drain 1. Spring (all Europe);2. Alarm Response.3. channel (all Europe);4.;5. Neo;6. Count Cards;7. The bridge;8. An value. 1. Spring (RID);2. Channel Bridge (removed);3. Anchor;4. Count Cards; -Jaguar were installed;-The project of rebuilding the bridge tribute Car expected to be finished by 2017, of which there have been design, installation of drain opening measurement part and automatic control.-The score: Europe Spring, Europe, Bridge, Channel Power, Horizontal, bridge By taking off only two operating modes (open or closed) so please don't need open measurement equipment.3 The node was installed measuring equipment for door status (open/closed) (not) 1. 1. Europe Spring Overview2.2. Europe Bridge Channels3.3. Fill Power4.4. Files5.5. An Aboriginal To accord with reality.4 the points button in the system to be installed in the flow measuring device 6. 1. Spring;2. Channel Bridge;3.;4. Anchor;5. Count Cards;6. The bridge;7. An value. 7. 1. Spring; -North hung Hai company are operating system mainly under the water level the key points.-Base needs determine the amount of water taken into the system.-Based on the recommendations in the SCADA system assessment report BHH system (a Vietnamese 02/5/2012) of INROS LACKNER AG: consulting costs very high flow measurement; not suitable as natural river channel morphology transformation over time.5 the points button in the system be installed in a water quality measurement equipment 8. 1. Spring;2. Channel Bridge;3.;4. Anchor;5. Count Cards;6. The bridge;7. An value. 1. The Bridge;2. An value.-due to other projects of Irrigation Science Institute is implementing water quality monitoring. So the only installation in Car Demand tribute, An observation of Basin water quality often served drained inverted.6 Motor 1. Pine Spring boat doors;2. Channel Bridge;3. File. 1. pine Spring boat Doors;2. Channel Bridge;3. File. Keep as 395 decisionAfter the design consultant, the investor is KTCTTL BHH Ltd has been reviewing and proposing a number of categories of equipment and the use of corporate funds to invest, BHH rest use ADB5 to project capital investment, in particular: Table 1: estimation of items supplied and installed the SCADA equipmentDetailed estimation SCADA devices under section B above table see AppendixWe recommend glass ADB review and approval of the scale as well as suggestions on sources of capital section provides and SCADA equipment installation by the BHH proposed above.
Being translated, please wait..
