Results (
English) 1:
[Copy]Copied!
At present, the company is executing a large project in the UCS name MPPU which this project will be to adapt the factory by extension structure demolition and installation of new systems installed by the company Styrolution company UCS has added take care of demolition and installation of the new system.To make everything be interested to study the installation of the device, because the project has equipped many of the MPPU device and would like to study the problems that arise during the installation, as well as to solve the problem. To find ways to prevent the problems that arise in the installation. The installation work must be planned carefully so that the good work and actual work time will be no weather with heavy duty too. That work was not planned and important work of installation of iko Grill. Preparation tasks and duties of a team meeting, clarification of each team so that everyone knows their roles, because the installation is not only a job, except the installation alone. To prepare a base installation of construction support alignment of the device into which, according to the. Grouts fittings and all related jobs. If there is an error or do not work which, according to the plan, put to other tasks require scrolling.From the study of installation equipment, found that many of the problems occur during installation, such as rainy weather beyond toleration as a result cause the job to be stopped, the base bolt installation phase has not been phases as in the specified. As a result, makes many tasks must be postponed to await the installation team. Edit period, based on the size of the Bolt, the base install does not have the size in the specified window does not come up, the team is planning to work on it before. As a result, the work was slow. This problem is corrected, the task page. Not find a way to prevent the same problem again, thus making the guidelines of how to prevent the problem in the installation, it is very important. After it has been inspected in accordance with the guidelines of how to prevent the problem in the installation I found that the installation can be performed according to the work plan to conduct the planned installation, even if there is a problem, the material must be used in making cement grouts, installation can proceed according to the plan, therefore, to bring the guidelines to the protection methods used in the installation work, it is necessary to continue studying the problem in installation. In order to provide a way to prevent that's all the problems that have occurred in the installation of the device.
Being translated, please wait..