Results (
English) 3:
[Copy]Copied!
Signs of damage to the floor tiles, many locations have to be taken down.The proposed solution: replace the damaged position, the middle position of the signal of the difference (the front deck. When laying bricks to have a thick layer of cement 3cm M75)
Being translated, please wait..
