Skim coat finish detail,
For quality finish to 5star standard.
The skim finish need to be 1.5mm to 2mm as per instructed and per information on the plastering finish product.
Note; There is not to be no transparency on the walls. Full inspection shall commence during and after plastering procedure.
As per training and video filming on date 20th August 2015. The five stages that was shown, shall be the way to move forward for faster results and to help any issues that may arise. I Gary Hogan Pace I.D shall be here to help with these issues and further training in development.
These are the 5 procedure on finish plaster.
1, make sure to wet the wall,
2, First coat application of plaster as shown mix texture.
3, Lay in coat to back fill.
4, 1st trowel when slightly sticky feel, (use water as you trowel),
5, Water finish troweling, repeat this twice. As shown for a good finish.
These procedures are for quality to 5 star finish required with little sanding or filling.
On base coat plaster door frame to wall. Fill and use scrim fiberglass mesh. To be supplied. Pace I.D