i) Details on why the NCS holdings report could not be generated (eg: error code, background on the error, etc)
ii) Statistics on the relying on subsequent day of recon as the holding report was not NCS fault (it will be helpful if you can also include the NCS fault that was resolved within the same day and managed to perform the recon on the same day)
iii) tickets to IT for the two dates above