Results (
English) 1:
[Copy]Copied!
The irrigation Office 10 install accelerator pump to pump and push the movement of water into the Canal, chainat-PA SAK.Mr. Phanukit Ditphueng The Director of the Office of the leading 10 officials of irrigation Department to hasten the installation of irrigation pumping machine with 15 mobile push water at floodgate manorom to pump and push water into the Canal, chainat-PA tattoo will be able to pump into the Canal was once a day 380000 M3. For consumer use. Consumer demand for longer than the 143 people 5 km to the province Nakhon sawan province of chainat, Lopburi in Sara buri and Phra Nakhon SI Ayutthaya. Because the water level in the Chao Phraya River, the water level of the lower mouth of the Canal. Not enough water needs of the people. That the Director of the Office of 10 specified that the irrigation irrigation is done in every possible way to increase the quantity of water into the Canal, chainat-PA SAK discount the impact that people will receive. The water is now used to produce the region's water supply? There is a problem with hard water water is not enough, the cost may be the rest of production. Need to add water to come in, wait to remove the risk of dehydration problem.
Being translated, please wait..
