Results (
Vietnamese) 1:
[Copy]Copied!
Only provide descriptions of meteorological characteristics relevant to the project and/orcalculations related to the EIA (air temperature, humidity, wind speed, direction and frequency ofwind, sun and radiation, the amount of rainfall, storm, and other abnormal meteorologicalconditions). Indicate the length of data chains as well as which data sources and documentswere used or referred to.2.1.3. Hydrographic and marine conditionsOnly provide descriptions of hydrographic and marine characteristics relevant to the projectand/or calculations related to the EIA (the level of water, volume of water flow, water speed, andother hydrographic and marine conditions). Indicate the length of data chains, as well as which datasources and documents were used or referred to.2.1.4. Current state of natural environmentOnly provide indications and descriptions of environmental factors likely to be directlyimpacted by the project, such as the atmosphere, which may directly receive air wasteemission from the project (attention should be paid to areas located near the project in themain wind direction), as well as water sources that may receive waste water directly from theproject, and land, sediment, and biological systems that will be directly impacted by wastes orother factors of the project.For air, water, land, and sediment impacts, it is necessary to note that- measuring, sampling and analyzing shall comply with the procedures and regulations ofenvironmental monitoring and analysis and that the results shall be accomplished and confirmedby functional bodies under the law;- clear instructions for collecting and analyzing data as part of the EIA should be supplied(location of measurements and samples must be coded, showing time and location; datamust be presented in tables and charts, and also illustrated with diagrams of samplinglocations); and- remarks on the pollution level of air, water, soil, and sediment in comparison to environmentaltechnical standards and norms should be included. Remarks on causes and sources of pollutionshould be made. If an environmental database is available, it should be used for preliminaryassessments of the carrying capacity of the project site in accordance with environmental technicalstandards and norms.
Being translated, please wait..
