Results (
English) 3:
[Copy]Copied!
After the election or the end of the re examination, in the inspection of the goods shipped in the LOT record, the record of the election, or re inspection of the results, the manufacturing sector is responsible for the decision to submit to the quality management.
Being translated, please wait..