Results (
Thai) 1:
[Copy]Copied!
According to the previous section, when pT is substituted for pin the objective and the constraint functions of problem (6), theprofit maximization problem is reduced to a single-variableproblem. In this section we provide means of finding numericallythe optimal value of the replenishment period
Being translated, please wait..
