Results (
English) 3:
[Copy]Copied!
Cost includes direct cost associated with the acquisition of the assets. The cost of construction enterprise asset construction, including the cost of the materials, direct labor and direct costs associated with the supply of other assets.The cost of demolition, removal, restored the location of assets and borrowing costs. Tool for control by copyright software which not can work without copyright software.
Being translated, please wait..
