Results (
English) 1:
[Copy]Copied!
1. responsibility of those responsible. Contractors are responsible for their employees, including subcontractors, contractors need to be managed by the employee which are.Responsible for complying with the obligations The rules and regulations of the various offices that already exist, and that there will be a fix.More In addition, contractors will bring this manual or the regulations excuses to use it instead of, or with the exception of laws or?Official requirements are not.2. the contractor's equipment. Contractor's vehicle equipment such as cranes, trucks and cars, etc. Must be legally registered and wish to care for, are in good condition. The representative of the Office or the supervisor has a duty to make the device. Machinery and vehicles of contractor anything that is incorrect, it must be corrected immediately by the contractor.3. the supplementary aid (UTILITLES) Every time the way contractors prefer to use equipment such as steam production, wind, etc., will need to get approval from a supervisor in that unit, and all the text from the system, something that enhances the production of the Office must have the tongue back attached tongue return to close to this point, and has a power tongue (Isolate Valve).4. per device. Prohibit contractors open – close or any tools or per pipe to the drain of the device and the information Office categorically including drains with. Open, close, or every time need to be approved by.A supervisor first. Once treated, the parts connected to it. Has become a device to use with Office. All contractors equipment parts must be in good, stable condition.5. electric power Recipients must obtain approval from the Department of electrical maintenance of Office, every time I want to power from the power supply system of the offices after connecting. Electrical systems that plug into, it will be considered as part of the electrical system of the Office. Any electrical work practices are required to inform the representatives of the Office and electrical maintenance supervisor in advance, but must follow the rules for electrical safety Office.6. submit your invoices to contractors, contract Cases, the contractor received the contract to hire Contractors will be required to complete a form contract. ICI, which is only used for the first time after making the contract, and the contractor filed for personal safety section. Introducing the relevant safety aspects before allowing worker.
Being translated, please wait..
