Results (
English) 3:
[Copy]Copied!
At present, in the actual construction site encountered many difficulties, due to the steel column cage, wall, stair column in the middle of the core and the aluminum pull method. Affect the progress of the project requirements. So CT qhp BCH coordination support:Steel cage to be performed to avoid the master pull in the plane layout (to qhp pull to October 11, 2016) > this issue in the qhp adjust the sending program (AGC shop to check). Because these questions are related to measures AGC Jacob's law. Qhp only for the construction of the steel. This kind of steel after the target, the method, M and E, stuck or conflict is normal, in the construction. So is not the only requirement is that an implementation of the work is satisfied with the requirements. This needs to be removed from the multi angle bchct problem. Job requirements: qhp adjustment to adjust the time, avoid a lot of time to ask bchct has affected a lot of progress, leading to the implementation of qhp is difficult to implement. Bchct solution to this problem requires adjustment is not required for the current qhp (many times)The steel - steel cage to perform less than steel welding position, the boss pull (typical details in a file attachment) > this installation and quality related C U steel cage in the transportation and installation of bchct was not seen. A place called Jacob steel belt is not a mandatory requirement of welding or zinc. If there is no such typical control card processing program is executed, in a unified steel project.Qhp bchct - construction measures to check all the suggestions to solve the problems of bchct treatment, there has been a lot of layer and execution layer is typical, it is difficult to avoid shaking reminder request the contractor sakhan below. When at last, from the construction measures of AGC unified (part of said) and the related execution time, qhp check with the consent of the executive.- this is the bchct need to pay attention to the conflict between the problems, the construction project, not only part of the project construction of steel.In order to facilitate the construction, to avoid affecting the progress of the project requirements, in accordance with the qhp implementation method for the upper and lower bars of the cage at the public school.Parts related attention and coordination.Cherish.
Being translated, please wait..
