Results (
English) 1:
[Copy]Copied!
5.1.5. the waste management-technologies for integrated energy production to suit the various elements in the area, established a Center for production of electric power and waste disposal so that they can benefit from the reuse of the highest. By the wat to evaluate mechanical life (Life Cycle Assessment) used to consider alternatives to manage solid waste to produce power.5.1.6 environmental impact assessment study and environmental impact assessment introduction to Ta chakoet during construction and waste disposal system. The survey, a preliminary hearing the opinions of the people, as well as recommending measures to prevent and correct problems that may occur, such as a smell problem. Water leaching waste problems, etc.5.1.7 the design detail waste disposal centre in order to produce electrical energy. By the following method. 1) exploring the terrain of the area that will be used as the establishment of a waste disposal centre in order to produce electrical energy. 2) detailed design, construction waste disposal Center, such as information technologies that are used in walking system. Control and prevention of the environmental impact, the Agency is responsible for. The number of personnel and khonkon that Bush needed to travel systems. Plan operations and maintenance machinery and equipment used in the operation, etc. 3.) to make a budget for the construction and supply of equipment and machinery needed to operate waste disposal centre in order to produce energy. 4) documentation to qualify investors and property requirements of a waste disposal centre in order to produce electrical energy. 5) economic value evaluation of the project.
Being translated, please wait..
