Rubblizing is the process of fracturing pavement of Portland Cement Concrete into angular pieces for direct overlay. Resonant Machines, the pioneer of Rubblization, has participated in over 25 different independent studies over the last two decades. Such analysis has shown the rubblized roads with an asphalt overlay have an average useful life of 22 years, while costing 60% less than the cost of tear out and replace of concrete and taking approximately 1/5th the time. RMI averages about one lane mile per day or approximately 7,000 square yards. Rubblization should be considered first when rehabilitating a concrete road. Rubblization destroys the integrity of existing concrete to allow for immediate overlay while still eliminating reflective cracking. The following are eliminated with Rubblization:Reflective crackingLoss of Bonding / RavelingMoisture damageRough riding roads and/or faultingASR and other degenerative reactions