Results (
English) 1:
[Copy]Copied!
10.5 technical infrastructure works:a) trafficSaigon Riverside-road width of 30 m.-The protective corridor horizontal viaduct bridges from the outer edge of the bridge back out each side a minimum of 07m.-Ensure the connection of the Saigon River Road traffic consistent with the project area.-Ensure the organisation of traffic out on the island.-The protection of the river corridor, according to the regulations.
Being translated, please wait..
