Results (
English) 1:
[Copy]Copied!
2.3.6 maintenance Design and operation of the system linking ray will be the entire warranty period of 2 years from the date of project completion reports are approved.2.4 preserve and unloading Structures of the system linking ray to be preserved in enclosed areas to avoid the adverse weather conditions. Special attention avoiding to stolen materials.
Being translated, please wait..
