The planned maintenance system should incorporate routine regeneration of pre-treatment systems, replenishment of resin beds (as required), change out of filters, gaskets, seals and RC membranes at a defined frequency or following adverse indicators as well as routine sanitisation of such systems. Detailed inspection checks should be incorporated into the routine planned maintenance to take account of the potential for the formation of blofilm within the system: