Results (
English) 3:
[Copy]Copied!
Monitoring set Regulator and leakage system.1.Valve of series regulator and leakage system.2. Open Valve tank 3 around. When you open the bell to ring.3. The rubber seal lid around the air out. Use the thumb press.4. Open your eyes Main Valve golden wind pressure to as set within 30 seconds.5. Close valve tank within the 10 second needle must not fall.6. Gradually open rubber cover your eyes air pressure, when the needle on the number 5 bell ringing.7. Close Main Valve gold.
Being translated, please wait..
