Results (
English) 1:
[Copy]Copied!
d) power supply:-Power supply: 2,100 KWh/person/year.-Power supply from 110 stations early stages/15-22KV Anqing and added from the station 110/15-Drive Sand 22KV.-Build 5 substation distribution of 15-22/0, 4KV station style room or placed in the basement, the unit capacity ≥ 1,000 KVA.-Planning approach appropriate distribution grid:+ New construction the 22KV leads along the main traffic in residential areas, using core XLPE insulated copper cable, an M-240mm2 buried underground.+ Traffic lighting using high pressure Sodium Lamps 150 ÷ 250w-220V high galvanized steel pillar mounted 7 ÷ 10 m. Power supply cable for lighting traffic to use M-16mm2 Cable construction of underground.
Being translated, please wait..
