Results (
English) 1:
[Copy]Copied!
CONTENT COSTS Construction and installation costRenovating the room settings in 6 drain and railway signal cableWells aquatic releasesOpen-drain devicesSCADA systemSCADA equipmentThe signal cable, power cable, optical cableThe cost of project managementThe cost of construction investmentOther costsPrevention costsPLUSROUNDEDCONTENT COSTS Construction and installation costRenovating the room settings in 6 drain and railway signal cableWells aquatic releasesOpen-drain devicesSCADA systemSCADA equipmentThe signal cable, power cable, optical cableThe cost of project managementThe cost of MANAGING PROJECTS in accordanceMANAGING PROJECTS costs increase (Pmu)The cost of construction investmentThe SCADA system design costCosts up tender HS, HS rating bid the construction of SCADA systemCosts up tender HS, HS evaluation bid system SCADA equipment shoppingThe cost of construction supervision SCADA systemsThe cost of monitoring equipment installation of SCADA systemOther costsThe SCADA system audit costsApproved inspection costs, capital of SCADA systemThe cost of insurance worksBank feesThe cost of translating documents and the other costPrevention costs PLUSROUNDEDEquipment/technical requirementsComputer operators (9 sets of in-station + 2 at TT)SCADA supervision software (including copyright SCADA software at the Center (Server), and remote stations and monitoring via the Internet)Equipment for Remote terminal unit (RTU)The device Master terminal unit (MTU)Equipment cabinet (contains RTU device, MTU and other equipment: source module, light, lightning spread, aptomat ...) -External Cabinet works -Equipment Cabinets in managers60 inch display at the work stationModem ADSL connection+ UPS backup powerBlack & white printer A4Color printer A3Limit Switch (measure the status close/open)Sensor measurements water levelSensor for measuring water quality: constant measuring deviceThe cost of training, including:Programming, testing, alignment of the SCADA systemThe cost of transportation of equipmentCost of installation, install and configure the devices:Installation costs Installation of the computer workstationLắpđặtthiếtbịRTUInstall the device MTUInstallation of equipment cabinetsScreen installation at the work stationModem ADSL connection installationInstallation of UPS and battery backupBlack & white A4 printer installationInstalling the black color printer A3Installation of the Limit Switch determines the status close/open drainInstallation of the sensor water level gauge zippersInstallation of sensors to measure the water levelInstallation of Sensor measuring water qualityInstalled in a host computer, display, projector, projection screen in the control centerThe device at the control center SCADA (server, 75 inch display screen, projector, projection screen, ...) -Server -The screen displays 75 " SONY projector VPL-EX276 or equivalentTOTAL (T1)Operating costsADSL subscription costsThe SCADA system maintenance costs Construction, pull the measuring signal cable laying there countering interference, power cable, optical cable, switchExecute the signal cable, power cable, optical cable
Being translated, please wait..
