Results (
English) 2:
[Copy]Copied!
The system links the proposed use must be tested according to Japanese standards JIS before the Engineer for approval.
The contractor must pay the cost of conducting these tests in a laboratory approved by the Engineer Conveniently.
Being translated, please wait..
