The construction of the
dam's construction division. The work into two parts: Personal element to the dam and power plant components. The construction of the dam And the implementation by the Department of Irrigation Work on this road to head for port work overburden the construction of dams, water diversion tunnel. River water tunnel Water tunnel into water turbines. Building a tunnel spillway. Excavation and rock the foundations of the dam and the power plant construction has started since 2511 His Majesty the King. Her Majesty the Queen has come to lay the foundation stone Prarachdmenin dam on February 27, 2514 and the construction of the dam was completed last year. In 2515
the construction of power plants and components. Operated by the Electricity Generating Authority of Thailand has begun work carried out since 2511 by the construction of 115 kV high voltage transmission line between the Sirikit Dam in Uttaradit. Construction of power plants and electrical equipment installation, steel piping. Bring the water to a power plant And construction of transmission line, high voltage 230 kV the dam - Phitsanulok simultaneously install generators at the power plant dam include three series production capacity set at 125,000 kW combined capacity of 375,000 kilowatts.
The power plant was completed in 2517 and features the King
, Her Majesty the Queen. And HRH Princess Maha Chakri Sirindhorn. HRH Princess Royal Has officially opened the dam. And power plant officially on March 4, 2520, after construction of the dam and the power plant has been completed, the Royal Irrigation Department. Presented by the Electricity Generating Authority of Thailand. Responsible for maintenance control dam.
Being translated, please wait..