DAIHO Phils, INC.
Matsuo president like
CC: Kagoshima like
Thank you for your help.
I was the other day to look, we have created a plane plan and cross-sectional view of the new plant in reference to your LIMA factory.
Because the land has not been determined, we do not know the exact dimensions of the land, because we have created for the time being for the integration, please confirm.
The main specifications are as follows.
※ main structure: Reinforced Concrete
※ outer wall: on top of the concrete block masonry mortar finish, waterproof coating (inner wall is water-based paint)
※ roof: on top of the steel truss, galvanized steel sheet 0.6㎜ roofing,
1, plane dimensions are 100m × 198m = 19,800m2 (9m × 22 span).
2, the cross-section 9.5m in the catwalk 4.0m crane crest.
3, molding machine storage is two rows +1 rows in the factory back (for expansion)
4, molding machine basis, regardless of the layout of the molding machine in the 8m width, overall perform.
5, 10 tons one in hoist crane molding machine two columns combination, two 5 tons to 3 tons a single installation.
6, placed the material introduction passage (slope) and unloading field to the back side catwalk.
7, due to the above-mentioned, established the Zhou circuit to the factory around.
8, installed six dock leveler in front of the loading area.
9, set up a molding machine such as large machinery of entrance (W = 6.0M H = 4.5M)
10, established the male and female toilets in the factory both sides.
11, established the approach path and the locker room of the workers.
12, installation intrusion path to the site (gate) two places.
13, installed two places a guard house in accordance with the above.
14, installed transformer yard to the factory on one side (the road near) (1500KVA × 2 groups = 3000KVA), electrical room, compressor room, the heat exchanger chamber.
15, set up a fire hydrant pump storage to the factory next to the nearby guard house
on the specifications of the above, necessary In the confirmation application of PEZA, rough estimate is in, but with the following construction work, if you have any opinions and requests your please tell us.
Building construction set, (except for the Fences construction) Exterior construction set, electrical work set (main power draw construction, lighting outlet construction, fire alarms work, lightning rod installation work, grounding) machinery and equipment construction (fire hydrant equipment ((fire hydrant pump , generator for the fire hydrant pump, water tank)) plumbing work
should be noted, offices and Canteen, drawing room, after the common areas such as conference room, which was finalized land, we will separately plan.
or more, thank you .