Results (
English) 1:
[Copy]Copied!
2. losses due to material inventory (Inventory) Purchase the material in large increments to ensure that materials are available for production at any time or to get a discount from the purchase will result in a material that is in excess of requirements can be used to date. As the burden of care and management. The problem, from a material inventory.-Use more storage space-Sunken costs.-The material degrades the quality (material inventory control system is not good enough).-Duplicate purchase order (if the material inventory control system is not sufficient).-Labor & management3. losses due to transportation (Transportation)Transport is an activity that does not cause more material, so they need to control and reduce transportation distances, only the necessary rest.The problem from the transport.-Transport costs, including fuel. Labor.-Waste of time in production.-Material damage if transport methods.4. losses due to motion (Motion)That stance is not appropriate, such as with a handful of remote addresses. Bend the heavy lifting that is placed on the floor, etc., out of the body and cause delay in the work.Motion problem-Born in motion that causes the loss of production time.-Originating fatigue and stress.-Accident.-Waste of time and labor to do the job.5. losses due to the manufacturing process (Processing)Resulting from the manufacturing process that have worked repeatedly in several steps, which are necessary because those jobs does not cause the value added to products as well job in a manufacturing process that does not allow a product caused the increased precision or quality, such as the quality of the product process, a process that does not cause the value added to products, so this process should be included in the production process, employees work as an auditor with the work or while waiting to get the machines working.The problem, from the production process.-The cost of the work.-Loss of space for the process.-Use the machine and Labor without causing more products.6. losses due to lead (Delay).Waiting, due to that machine, or the employee stops working because they have to wait for some factors that are required to manufacture, such as raw material. Waiting due to machine failure. Waiting, due to the manufacturing process is not balanced. Waiting due to a change of generation, production, etc. Issues from the lead-The cost of Labour's wasteland The machines and the burden does not cause the value added.-Opportunity cost occurs.-The subject and capacity problems7. losses due to the production of waste (Defect)When the waste was produced out of the damage they could be new amendment to meet the customers needs, or discarded. Therefore, the loss due to the production of waste.The problem, from the production of waste.-Cost of raw materials. Machinery. The loss of workers to benefits.-Waste in storage and disposal of waste.-To repeat the task to edit the task.-Opportunity cost occurs.
Being translated, please wait..